Meeting CANopen Special Interest Group Lift 2011-05: Difference between revisions
(Created page with "de:Treffen_der_CANopen_Spezial_Interest_Group_Lift_5-2011 On May 11th 2011 a meeting of the SIG Lift took place at CiA offfice Nuremberg. After a review of the last meetin...") |
No edit summary |
||
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
[[de: | [[de:Treffen der CANopen Special Interest Group Lift 2011-05]] | ||
On May 11th 2011 a meeting of the [[SIG Lift]] took place at CiA office Nuremberg. | |||
After a review of the last meeting and the comments to the new version 2.1 of the specification, there was a discussion on the submitted enhancements regarding a tunneling of messages for monitoring tools, virtual inputs for the detection of persons in the lift car and in front of the doors, new parameters for the drive unit, COB-IDs for tunneling the control messages in a group of lifts. Furthermore the topic of implementing an energy controller as a virtual device was declined. A virtual device for quality measurements was also declined by the group. | |||
Then the extension of the CANopen-Lift Demonstrator has been discussed. | |||
Then the | |||
Furthermore a procedure for an automatically software update function for a complete lift was discussed. | Furthermore a procedure for an automatically software update function for a complete lift was discussed. | ||
[[category: | [[category:Press]] | ||
[[category:SIG Lift]] |
Latest revision as of 13:13, 18 September 2016
On May 11th 2011 a meeting of the SIG Lift took place at CiA office Nuremberg.
After a review of the last meeting and the comments to the new version 2.1 of the specification, there was a discussion on the submitted enhancements regarding a tunneling of messages for monitoring tools, virtual inputs for the detection of persons in the lift car and in front of the doors, new parameters for the drive unit, COB-IDs for tunneling the control messages in a group of lifts. Furthermore the topic of implementing an energy controller as a virtual device was declined. A virtual device for quality measurements was also declined by the group.
Then the extension of the CANopen-Lift Demonstrator has been discussed.
Furthermore a procedure for an automatically software update function for a complete lift was discussed.